02 — Landed A&A & New Builds

Your landed home and work premises, designed with intention.

An eight-week architectural and fengshui design engagement for landed homeowners or business premises — from first brief to a complete, buildable plan.

THE SITUATION

A blank canvas is the most powerful position to build from.

When you’re rebuilding, extending, or doing a full A&A, fengshui doesn’t have to work around a finished layout. It can shape the layout itself — from the placement of the front door to the orientation of the master bedroom to the direction the kitchen opens.

Over eight weeks, we develop a design that is architecturally resolved, fengshui-informed, and ready for your contractor or a follow up QP to build from.

WHAT YOU RECEIVE

What The Plan delivers.

Architectural Site Analysis 

Review site potential and constraints pertaining to compliance and regulations. For Businesses, we evaluate and advise on the required submissions for compliance

 

Feature Placement Notes

Identify suitable locations for water features, plants and artwork within the overall scheme.

 

Developed Layouts

See floor plans with recommended room arrangements and circulation

 

Qi Flow Strategy

Trace how movement connects rooms and where circulation can feel more open and balanced.

 

Fengshui Direction Report 

Understand sector analysis, key placements, positions and favourable orientations for your space.

 

D&B Contractor Ready Brief

Hand your design & build contractor or renovation team a coordinated set of brief and floor plan that they can develop into details and bring the plans to reality

 

Colour & Material Guide

Explore palettes and finish directions tailored to the energy of each area.

 

 

 

THE EIGHT-WEEK PROCESS

How The Plan unfolds.

01

WEEK 1-2

Brief & Site Analysis

Spatial programming, site orientation review, compliance and regulatory assessment, fengshui mapping of the site and household.

02

WEEK 3-5

Layout Development

Schematic floor plans across one or more layout schemes, fengshui integration at the structural level, room allocation and circulation resolved together.

03

WEEK 6-7

Layout Design Refinement

Preferred scheme developed in detail — room proportions, openings, key spatial relationships. Fengshui direction report produced. Spatial programming, site orientation review, compliance and regulatory assessment, fengshui mapping of the site and household.

04

WEEK 8

Brief for Delivery

Colour and material direction, feature placement notes, and a contractor-ready brief your design and build team can take directly into execution.

WHO IS THIS FOR

The Plan is suited to:

— Landed homeowners undertaking an A&A

— Owners rebuilding on an existing plot

    — Those purchasing a landed property and planning a full redesign

        — Business owners developing a commercial space from the ground up

            THINKING ABOUT STAYING INVOLVED THROUGH CONSTRUCTION?

            The Build includes everything in The Plan, plus Emote Space alongside you through execution.

            Ready to begin?

            Every great space starts with a clear brief.

            Begin with a complimentary brief form.

            Whatever you decide next, the brief is yours to keep.

            EMOTE SPACE PLANNING

            By Swing Architects & Master David Goh